Bell Roof & ExteriorVetted Bell roofing crews, no obligation to hire.(323) 655-6954Get a quote

Bell, CA

Tile and slate roofing in Bell

Slate and clay are the two coverings that routinely outlive the people who chose them. They are also the two that the wrong crew can ruin in an afternoon.

Or call (323) 655-6954

Describe the tile and slate job

Three questions, then the address. Up to three Bell contractors who do this work.

Or call (323) 655-6954

Free estimate · No obligation

Describe the tile and slate job

Three questions, then the address. Up to three Bell contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free. You are not committing to anything.

Before you let anybody on the roof

The things worth pinning down on a tile and slate job. A contractor who has not raised them has not looked properly.

  • What percentage of tile breakage they expect and how it is priced
  • Whether battens are being replaced at the same time
  • The condition and age of the underlayment beneath
  • Whether the tile can be salvaged and relaid
  • Fastener specification, especially near salt air

Matching discontinued tile is the real constraint. Salvaging what is there is usually cheaper and always closer.

Underlayment life under tile is typically twenty to thirty years. The tile above it is rated for fifty or more. Plan for one relay in the life of the roof.

Slate wants copper or stainless fasteners and a crew who has done it before. Steel nails on a slate roof is a hundred-year covering held down by a thirty-year fixing.

Locally

Then, less dramatically: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.

About tile and slate here

Can I stay in the house while it is done?

Yes, though it is loud, and things will fall off shelves in the garage. Move cars out of the driveway and take anything fragile off the walls of the top floor.

Do you handle commercial buildings?

We do. It is a different set of contractors — commercial and low-slope work is a separate trade from residential re-roofing — so answering the property question accurately matters.

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

What time of year is best to re-roof in Bell?

Practically, the long dry run from May to October. Crews are busiest right after the weather turns — November through March — so booking outside that stretch usually buys you a better date and a keener number.

Start with a free estimate

No cost, no obligation, and never more than three contractors.

(323) 655-6954Call nowGet a quote